|
Proven Experience
Fifteen Years of IT Experience
WESTON has developed site-specific technology, providing high-quality work and significant time and cost savings for our clients:
As lead
environmental contractor for the largest emergency response ever
conducted by EPA, the Space Shuttle Columbia recovery,
WESTON developed a PDA-based application to log recovered items,
and provided data in real-time via the Web.
For a gas
transmission corporation, WESTON investigated over
11,000 sites and collected, managed, and delivered data electronically.
For construction
on a former landfill site, WESTON automated six
air-monitoring stations for real-time Web-based data monitoring,
reporting, and alarm notification, and automated the materials and
truck manifesting system for excavation of 700,000 tons of contaminated
soil.
For an
automobile manufacturer, WESTON built a Lotus Notes-based
purchasing system for Value Analysis Automation and an environmental
document retention system.
For the U.S. Army,
WESTON developed an Environmental Program Requirements (EPR) Process
Web site to help review environmental projects.
For consumer products
manufacturers, WESTON developed a Web-based global regulatory
requirements tracking system and Web-based auditing systems.
For Alameda County,
California, WESTON built an Intranet GIS
with document management capabilities to leverage its geographic
and document image data sets.
|