|
 |
 |
Federal Government
GREENGRID® ROOFING SYSTEM
Federal Supply Schedule 056
Building and Building Materials/Industrial Services and Suppiles
Contractor:
Weston
Solutions, Inc.
3840
Commons Avenue N.E.
Albuquerque, NM 87109-5831 |
Contract
No.
GS-07F-5814R
Contract
Period:
05
May 2005
– 04 May 2010
Option Periods thru 24 May 2025 |
Telephone:
Technical: 847-918-4016
Contractual: 505-837-6548
Fax:
505-837-6595 Attn:
Rita Muniz
E-mail |
Business
Size:
Other than Small
DUNS
No.:
11-625-4574
CAGE
Code: 3HZE3 |
Contractor
Points of Contact:
David
Campbell
Program Manager
(202) 741-4812
Kurt
T. Fischer, P.G.
General Manager
847-918-4016
Laura Tetreault
Contract Financial Administrator
505-837-6529 |
Contract Administration:
Weston
Solutions, Inc.
Attn: Rita Muniz
3840
Commons Avenue N.E.
Albuquerque, NM 87109-5831
505-837-6548 |
Weston Solutions, Inc. (WESTON®)
delivers integrated, sustainable solutions for environmental restoration,
property redevelopment, design/build construction, green buildings
and clean energy. Our engineers, scientists, and energy professionals
integrate environmental performance considerations into client
operations identifying ways to effectively enhance resource efficiency,
use renewable resources, assess product or system life-cycles,
identify alternatives for waste disposal incorporating waste reduction,
and implement pollution prevention.
WESTON® has a team of over
50 LEED® accredited professionals with extensive experience
in incorporating Sustainable Design/LEED® into construction
projects on Federal installations throughout the country. Starting
from the planning phase throughout the design and construction,
WESTON evaluates a wide range of technologies, techniques, materials,
and strategies to incorporate sustainable actions and ensure compliance
with regulations while developing environmentally efficient facilities.
GREENGRID® ROOFING
SYSTEM
Federal Supply Schedule 056
Building and Building Materials/Industrial Services and Suppiles
SIN
563-4 – GreenGrid® Roofing
System
This flexible roof system is suited for both new and existing
facilities to improve energy efficiency and storm water
discharge performance while promoting a healthier environment.
These visually appealing roofs are dramatically cooler
in the summer and warmer in the winter and are a modular
design that arrives at the job site planted and ready for
installation. The modules, made of 100% recycled HMWPE
plastics, are placed directly on the existing roofing membrane
or any other surface with sufficient load bearing capacity.
The GreenGrid® can also be installed at grade in locations
where owners desire a simple, flexible greening system.
Because it is modular, a GreenGrid® rooftop design
can be easily adjusted and rearranged after installation
to meet a change in stylistic preferences, planting schemes,
or maintenance issue.
-
The
modules come in three different depths. The 2.5-in. depth modules
will support sedums and weigh approximately 11 to 13 lbs. per
sq. ft. (wet). The standard 4-in. depth modules will support
grasses, sedums and wildflowers, and weigh approximately 18
to 24 lbs. per sq. ft. (wet). The 8-in. depth modules will
support a large variety of ornamental perennials and shrubs,
and weigh approximately 35 lbs. per sq. ft. and up (wet). The
modules are available in square, rectangular and triangle shapes.
Plants are placed in the modules at the nursery and cared for
until they are shipped to the job site for installation. Both
fast turnaround pre-planted versions and longer grow out times
for increased plant coverage at time of delivery options are
available. Preset “palettes” of plants, developed
by staff horticulturists, are available to allow customers
to select plant varieties according to plant hardiness zone,
size and color.
Weston Solutions
GreenGrid® Roofing
System Schedule 056 -
Pricing
Year 6 Rates - May
2010 - April 2011
Year
7 Rates - May 2011 - April 2012
Year 8 Rates - May 2012 - April 2013
Year 9 Rates - May 2013 - April 2014
Year 10 Rates - May 2014 - April 2015
Labor
Category |
Option 1
Year 6 |
Option
1
Year 7 |
Option
1
Year 8 |
Option
1
Year 9 |
Option
1
Year 10 |
Principal / Vice
President |
$234.67 |
$242.89 |
$251.39 |
$260.19 |
$269.29 |
Manager SR |
$185.31 |
$191.79 |
$198.51 |
$205.45 |
$212.65 |
Manager |
$167.39 |
$173.25 |
$179.31 |
$185.59 |
$192.08 |
| |
|
|
|
|
|
CADD Operators |
$80.32 |
$83.13 |
$86.04 |
$89.05 |
$92.17 |
|
|
|
|
|
|
Contract Administrator |
$139.22 |
$144.09 |
$149.14 |
$154.35 |
$159.76 |
Subcontract Administrator |
$114.49 |
$118.50 |
$122.65 |
$126.94 |
$131.38 |
Purchasing Agent/Buyer |
$89.39 |
$92.52 |
$95.76 |
$99.11 |
$102.58 |
|
|
|
|
|
|
Financial / Cost
Analyst SR |
$125.21 |
$129.59 |
$134.12 |
$138.82 |
$143.68 |
Financial / Cost
Analyst MID |
$86.28 |
$89.30 |
$92.43 |
$95.66 |
$99.01 |
Financial / Cost
Analyst JR |
$65.33 |
$67.61 |
$69.98 |
$72.43 |
$74.96 |
|
|
|
|
|
|
Administrative
Assistant |
$58.97 |
$61.04 |
$63.17 |
$65.38 |
$67.67 |
Word Processing
Operator |
$60.96 |
$63.09 |
$65.30 |
$67.58 |
$69.95 |
|
|
|
|
|
|
Environmental
Scientist SR |
$129.11 |
$133.63 |
$138.31 |
$143.15 |
$148.16 |
Environmental
Scientist MID |
$91.69 |
$94.90 |
$98.22 |
$101.66 |
$105.22 |
Environmental
Scientist JR |
$69.45 |
$71.89 |
$74.40 |
$77.01 |
$79.70 |
|
|
|
|
|
|
Health & Safety
Officer SR |
$142.27 |
$147.25 |
$152.41 |
$157.74 |
$163.26 |
Health & Safety
Officer MID |
$102.68 |
$106.27 |
$109.99 |
$113.84 |
$117.83 |
Health & Safety
Officer JR |
$86.59 |
$89.62 |
$92.75 |
$96.00 |
$99.36 |
|
|
|
|
|
|
Civil Engineer
SR |
$153.53 |
$158.90 |
$164.46 |
$170.22 |
$176.17 |
Civil Engineer
MID |
$114.80 |
$118.81 |
$122.97 |
$127.28 |
$131.73 |
Civil Engineer
JR |
$86.69 |
$89.72 |
$92.87 |
$96.12 |
$99.48 |
|
|
|
|
|
|
Environmental
Engineer SR |
$147.64 |
$152.81 |
$158.16 |
$163.70 |
$169.42 |
Environmental
Engineer MID |
$111.39 |
$115.29 |
$119.32 |
$123.50 |
$127.82 |
Environmental
Engineer JR |
$79.34 |
$82.12 |
$84.99 |
$87.97 |
$91.05 |
|
|
|
|
|
|
General Engineer
SR |
$158.94 |
$164.51 |
$170.26 |
$176.22 |
$182.39 |
General Engineer
MID |
$111.76 |
$115.68 |
$119.72 |
$123.92 |
$128.25 |
General Engineer
JR |
$76.80 |
$79.49 |
$82.27 |
$85.15 |
$88.13 |
|
|
|
|
|
|
Construction
Engineers SR |
$124.62 |
$128.98 |
$133.49 |
$138.16 |
$143.00 |
Construction
Engineers JR |
$91.11 |
$94.30 |
$97.60 |
$101.01 |
$104.55 |
Module Options and Other Direct
Costs
(Module Prices vary by Zone,
please contact Laura.Tetreault@westonsolutions.com for detailed
pricing on Modules and ODC’s.)
Customer
Information
| 1a. |
TABLE OF AWARDED SPECIAL ITEM NUMBERS (SINs) |
| |
| SIN |
DESCRIPTION |
| 563-4 |
Roofing Materials, Products and Services |
|
| 1b. |
LOWEST PRICED MODEL NUMBER AND PRICE FOR EACH SIN:
|
| |
| See Labor Category pricing above. |
|
| 2. |
MAXIMUM ORDER*: $200,000 per order
*A delivery order that exceeds the maximum order may be placed under the schedule contract in accordance with FAR 8-405-1 (d). |
| 3. |
MINIMUM ORDER: $0.00 |
| 4. |
GEOGRAPHIC COVERAGE: Domestic 50 states, Washington DC, Puerto Rico, and US Territories |
| 5. |
POINT(S) OF PRODUCTION: Modules are produced in the following locations: Pittsburg (Crawford County), KS; McMinnville (Yamill County), OR; Manitowoc (Manitowoc County), WI; Chicago (Cook County), IL. Final modules including plant species are customized for each geographic area installed. |
| 6. |
Discount FROM LIST PRICES: 10% from the
accepted price list for materials and 29.01% discount for services.
Current IFF rate of 0.75% is included in all rates. |
| 7. |
QUANTITY DISCOUNT(S): An additional $2.00 per square foot for materials on orders greater than 10,000 square feet. |
| 8. |
PROMPT PAYMENT TERMS: 1% 10 days. |
| 9a. |
Government Purchase Cards must be accepted at or
below the micro-purchase threshold.
Weston Solutions will accept Government Purchase Card
for orders of $2,500 or less. |
| 9b. |
Government Purchase Cards are accepted above the
micro-purchase threshold.
Weston Solutions will accept Government
Purchase Card for orders over $2,500. |
| 10. |
Foreign Items: None |
| 11a. |
Time of Delivery: 90 days after receipt of order |
| 11b. |
EXPEDITED DELIVERY: None |
| 11c. |
OVERNIGHT AND 2-DAY DELIVERY: None |
| 11d. |
URGENT REQUIREMENTS: None |
| 12. |
FOB POINT: Origin |
| 13. |
ORDERING ADDRESS:
Weston Solutions, Inc.
3840 Commons Avenue N.E.
Albuquerque, NM 87109-5831 |
| 14. |
PAYMENT ADDRESS:
Weston Solutions Inc.
P.O. Box 405163
Atlanta, GA 30384-5163 |
| 15. |
WARRANTY PROVISIONS: Standard Commercial
Warranty. |
| 16. |
EXPORT PACKING CHARGES: Not applicable |
| 17. |
TERMS AND CONDITIONS OF GOVERNMENT PURCHASE CARD
ACCEPTANCE: Contact Weston’s Financial Administrator in regard to purchase over the micro-purchase level. |
| 18. |
TERMS AND CONDITIONS OF RENTAL, MAINTENANCE, AND
REPAIR (IF APPLICABLE): N/A |
| 19. |
TERMS AND CONDITIONS OF INSTALLATION (IF APPLICABLE): N/A |
| 20. |
TERMS AND CONDITIONS OF REPAIR PARTS INDICATING DATE
OF PARTS PRICE LISTS AND ANY DISCOUNTS FROM LIST PRICES (IF
AVAILABLE): N/A |
| 21. |
TERMS AND CONDITIONS FOR ANY OTHER SERVICES: N/A |
| 22. |
LIST OF SERVICE AND DISTRIBUTION POINTS (IF APPLICABLE): N/A |
| 23. |
PREVENTATIVE MAINTENANCE (IF APPLICABLE): N/A |
| 24a. |
SPECIAL ATTRIBUTES SUCH AS ENVIRONMENTAL ATTRIBUTES: GreenGrid®
plant modules and other components are made from recycled materials. |
| 24b. |
Section 508 Compliance for EIT: N/A |
| 25. |
DUNS NUMBER: 11-625-4574 |
| 26. |
NOTIFICATION REGARDING REGISTRATION IN CENTRAL CONTRACTOR
REGISTRATION (CCR) DATABASE: Registration current. |
|
 |
| WESTON Contact |
1-800-7WESTON
E-mail  |
 |
| GS-07F-5814R Terms |
|
 |
| Related Links |
|
|
|